Week 2 (16 - 22 November 2009)

SO MANY THINGS TO DO....

Design, material selections, fabrication, analysis, testing, etc...

Hopefully the design is ready by the end of the week, and fabrication can be done ASAP!! Not much time left since our holiday is going to end in a week. It's not easy to gather everyone when the classes start.

This week's progress:

1. Discussion, discussion and lots of discussions.....need to finalize the design ASAP!!

2. We've got permission to use a lab in the college to do fabrication and a room for discussions and equipments storage

3. The microhydro team has started doing the analysis using software and compared few solutions.

4. The solar team went to some shops around Bangi, Kajang, and Kuala Lumpur to survey price of the things to be bought.

5. On Wednesday we had our first meeting with our mentors from DIGI - Wilson, Ivy, and Cheng. Thanx for coming to UNITEN, guys!!! =) We had discussed a lot of things including the technical and also non-technical stuffs. It was great for 'The Origin' to have this session since we had no chance to meet them when we was in Sabah. Our next meeting will be on the 8th of January 2010, and we will also keep in touch via messenger, email and phone.

6. We bought our first equipment to be used in Challenge 2 from an electrical shop somewhere in Kajang.


That is all for this week. Thanx, readers!!! (^_^)